Various solutions can be provided depending on the load current of the users. Reactive power compensation cabinet is optional for LV LPU users.
Grid meter, instrument transformers, switch and control equipment to measure a complete energy flow and identify the source of the grid losses.
Integration of AMI and DA will benefit Utility in a long run and it will be a more holistic approach to build smart grid.
INHE Smart Power Distribution Industrial Base, Hi-tech Zone, Zhuhai, China, P.C.519000
+86 (0)756-331-3166
+86 (0)756-368-9169
8/F & 9/F, 1A, Software Park, Southern Hi-Tech Zone, Nanshan District, Shenzhen, China, P.C.518054
+86 (0)755-2661-6686
+86 (0)755-2661-6689